The above diagram shows the applied processes inside the GTC System for the time- & cost related project performance control.
The control processes of the standard project management „control loop“ are particularely adopted for the GTC System comprising the
-
- project planning (baseline / plan) according to contract settings
- project execution (disturbance factors)
- project tracking (actual)
- project analysis (variations actual vs. baseline / plan)
- project status report (with analysis data for diagnostic)
- project steering (steering measures)