GTC Performance Analysis (EN)

GTC System – Project Performance Analysis

Integrated component of GTC Project Performance Control Systems is the  digitised Project Performance Analysis System (GTC – Software, Windows Application) for the analysis of the monthly cost– & time variances vs. the Project Plan / Baseline, variances caused through disruptions and / or additions. 

The graphic above shows the structure of the GTC Project Performance Analysis System Software.

The GTC Software is capable to analyse

    • several Projects (Level 0) in parallel
    • or to analyse one Project (Level 0) with its sub-Projects (Level 1).

Further, valuable simulation oprtions are support the analysis objectives.